Objectives
- Persue and study all that is needed to become one of the top leaders in Project Management, use our abilities to empower people and tools to reach their potential to facilitate all aspects of development. We love challenged and problem solving!
- To be able to work with you and your team to reach your goals and maximize project completion.
About Me
I am originally from Evanston, Wyoming. I am number three of six children. I am an Eagle Scout. I grew up with a father who felt that it was important that you learn as much as you can about all different professional fields. He has taught me how to do a vast number of things which include: car repair and maintenance, plumbing and electrical, landscaping, real estate managing, and to be a HARD worker with integrity.
Work History
Feb 2011: Started “Executive Designed Investments/Builders” A fee based management company;
I managed a 1 million dollar remodel to Doug Adams residence in two months.
Build a gold milling operation in 2.5 months.
Helped increase bonding ability of local contractor and helped in securing millions in projects.
Developed the largest residential solar project in Southern Nevada 40kw, 165 panels.
Developed the complete build out of the largest cabinet drawer manufacturing facility, self performed all the electrical and dust extraction and airline systems.
Worked on design and integration of a 3 phase 600 amp variable drive controller for an agricultural well pump that serviced some 5 160 acre center pivots.
Worked with local underground utility contractor to increase sales and job tracking.
May 2008- Feb 2011: I worked as a project manager and business consultant to Power Up Nevada. Where I helped orchestrate the company going from $1/2 million in projects to $2.3 million and from 5 employees to 35 employees in 10 months. Helped maintain at least $2.4 million in projects though 2009 and 2010.
Feb 2007- May 2008: I worked as a cabinet designer and lead salesman for Full House Cabinet GALLERY and partnered with Jarrod Huntsman to expand his painting business to include drywall.
Nov 2006- Present: I pursued an 1100-acre land acquisition and development project in Grantsville, UT (West of Salt Lake City) “Estates at Bakers Canyon” We completed Concept Approval, Zoning Change, and Partial on the preliminary plat. We have renewed interest and are pursuing funding. We have working contracts with Bergman’s of BWA for design and architecture, Sunrise Engineering for civils, Dye Designs for the golf course, and Howard Herd for equestrian design and operation. www.pinnacleut.com
May 2005- Feb 2007: I was recruited by Stacy Slade of Slade Development to manage their custom homes from conception to completion. Including budget and people management, job layout, and bidding. My projects ranged in budgets from $850,000 to $4.3 million. I left to pursue an 1100-acre development project in Utah.
Jan 2004- May 2005: I started a side business, “The Marine Specialist”. I set up and service salt water aquariums for homes and offices. I started with three costumers and when I sold it, I had eleven costumers.
Oct 2003- May 2005: Paul Cozzens, owner of Cozzens Cabinets. recruited me for specialty work. Our work was in the high-end multi-million dollar homes and commercial. I became the “Installation Supervisor” in February 2005. In charge of vehicles and 4-man crew; we traveled out of state for 85% of the jobs.
July 2003- Oct 2003: Worked for Martin Anderson as the construction superintendent over five workers, building custom homes, and doctor’s MRI facility. We performed all aspects of the construction.
Apr 2001- July 2003: Worked for Phelp’s Wood Designs as the “Head of Assembly”. I was instrumental in helping increase output from 15 cabinets daily to 28 cabinets daily with the same two employees. I also received a certificate in Lien Manufacturing.
Spring 2003: I also attended and completed Real Estate school.
Aug 200- May 2001: I was a “Resident Advisor” (RA) in the cooking dorms for Southern Utah University Housing. I also worked part time painting for S.U.U. housing’s maintenance.
May 2000- Aug 2000: I ran a paint crew for Lamber Painting CO. in Evanston.
Jan 2000- May 2000: While attending my first semester at S.U.U. I worked for Linford Neilson, I did his finish work (trim, floors, and painting) on cabins, and I built log pole furniture.
Dec 1997- Dec 1999: I served a two year “Spanish speaking” mission in Guatemala City, Guatemala.
Leadership
I have help many leadership positions in the Boy and Cub Scout programs as well as many other positions of leadership in my Church. All of these positions have helped be able to organize people and events, and have taught me how to work with all types of people.
Membership
The Church of Jesus Christ of Latter-Day Saints
Interests
People Enlightenment/Development, Fishing, Camping, New Technologies
Causes
- Disaster and Humanitarian Relief
- Education
- Ecocomic Empowerment
- Science and Technology
- Children
- Politics
- Health
- Environment
Education
Southern Utah University
Technology Ed./ Business Management
2000-2002
Evanston High School
Biology and Fine Woodworking
1993-1997
Activities and Societies
Football, Baseball, Seminary Council President
References
Dennis Egbert (OWNER OF Power Up Nevada (702) 250-1205
Rick Johns (SUB CONTRACTOR, OWNER OF Cinivision) (702) 289-7170
Scott Bugbee (GENERAL CONTRACTOR) (702) 497-3557
Bob Saxton (CLIENT) (702) 596-7592
Doug Adams (CLIENT) (416) 565-7592
Layne Rosequist (CLIENT) (701) 809-8657
Scott and Lana Stowell (CLIENT) (702) 221-8110